Checklist: URS Requirement Quality and Testability Review

A plug-and-play review checklist to confirm each requirement in a URS is atomic, testable, uniquely identified, risk- and GxP-classified, and free of solution language, before configuration and testing begin, with a filled specimen and the regulations it satisfies.

Document type: Checklist

Read and copy the template below into your own quality system. It is a generic starting point for your own internal use, provided as is, with no warranty; see the Terms and License. Adopting it does not by itself create compliance.

This is a ready-to-use checklist for reviewing a User Requirements Specification before it is approved and before configuration or testing starts. It catches the requirement defects that quietly wreck a validation: vague wording, compound statements, missing IDs, absent data integrity controls, and solution language that belongs in a design spec. Run it per requirement for the critical ones, and per document for the whole-URS checks. Mark Pass, Fail, or N/A with a note; any Fail is fixed before approval. Replace every <<FILL: ...>> placeholder with your own specifics. A worked filled specimen follows. Verify each cited regulation against the current source before you rely on it.

Document control header

FieldEntry
URS under review<<FILL: title and doc no>>
System<<FILL: system name / ID>>
GAMP category<<FILL: 3 / 4 / 5>>
Reviewer(s)<<FILL: names and roles, incl. QA and SME>>
Review date<<FILL: date>>

Part A: whole-document checks (run once for the URS)

#ItemReferenceResult
A1Document control is complete: title, number, version, author, reviewers, approvers, effective date.GDocPPass / Fail / NA
A2Purpose, scope, and system context (interfaces, GxP use) are stated.Annex 11Pass / Fail / NA
A3Requirements are grouped by category (functional, data, interface, data integrity, security, performance, operational, reporting).GAMP 5Pass / Fail / NA
A4Part 11 / Annex 11 controls are present as explicit requirements: audit trail, unique user IDs, access control/segregation of duties, e-signature components, time synchronization, record retention.21 CFR Part 11; Annex 11Pass / Fail / NA
A5The URS reflects the company’s needs, not a vendor brochure; authorship is the regulated company’s.Annex 11 cl. 4.4Pass / Fail / NA
A6Every requirement has a unique, stable ID with no renumbering.GAMP 5Pass / Fail / NA
A7A GxP flag and a risk/priority field exist on every requirement.ICH Q9; Annex 11 cl. 4.4Pass / Fail / NA
A8The document is set up to trace into the RTM (IDs usable as the traceability spine).Annex 11 cl. 4.4Pass / Fail / NA
A9Reviewed and approved by system owner, QA, and an SME before configuration.ICH Q10Pass / Fail / NA

Part B: per-requirement checks (run for each requirement, at least all GxP-critical ones)

#ItemResult
B1Atomic: one requirement per statement (no hidden “and” splitting it into two).Pass / Fail / NA
B2Unambiguous: no “user-friendly,” “fast,” “as appropriate,” “as needed,” “industry standard,” “etc.” as the operative term.Pass / Fail / NA
B3Measurable: quantities and limits are stated (time, count, threshold, tolerance).Pass / Fail / NA
B4Stated as trigger plus action plus expected result, so a tester can design one objective pass/fail test.Pass / Fail / NA
B5”Shall” for mandatory, “should” for desirable, used consistently; desirables will not block release.Pass / Fail / NA
B6No solution/design language (names what, not how; internal mechanisms belong in the DS).Pass / Fail / NA
B7Unique ID present and stable.Pass / Fail / NA
B8GxP flag and risk/priority set, consistent with the requirement’s impact.Pass / Fail / NA
B9Source referenced (regulation, SOP, business need, process step) so it is not an orphan.Pass / Fail / NA
B10A competent tester with no access to the author could verify it from the text alone.Pass / Fail / NA

Acceptance criteria

The URS is ready for approval when every Part A item is Pass, every GxP-critical requirement passes all Part B checks, and every Fail has been corrected (not waived). A single untestable or compound GxP-critical requirement is enough to send the document back.

References

EU GMP Annex 11 (Computerised Systems), clause 4.4 (URS based on documented risk assessment, traceable across the lifecycle). 21 CFR Part 11 (electronic records and signatures). ISPE GAMP 5, Second Edition (requirements as the anchor for specification, risk, and verification). FDA, Computer Software Assurance for Production and Quality Management System Software (issued 3 February 2026, superseding the 24 September 2025 final). ICH Q9 (Quality Risk Management); ICH Q10 (Pharmaceutical Quality System).

Confirm the current version and clause numbers before issue, and confirm the in-force Annex 11.

Sign-off

RoleNameSignatureDate
Reviewer (SME)<<FILL>>
Reviewer (QA)<<FILL>>

Filled specimen

The following shows the per-requirement check applied to three requirements from an illustrative LIMS URS, so you can see how the review catches defects.

Req IDRequirement text (as submitted)Check resultReviewer action
URS-041The system shall be user-friendly and fast.B2 Fail, B3 Fail, B1 Fail (compound)Rejected. Split and rewritten: URS-041a response time within 5 seconds for a sample search at 50 concurrent users (Desirable); usability moved to a UAT acceptance task.
URS-052When a saved GxP record is modified, the system shall record a time-stamped, attributable audit entry capturing old value, new value, user, date/time, and reason.All PassAccepted. GxP flag Yes, risk High, traced to OQ.
URS-058The system shall use a database trigger to prevent self-approval of results.B6 Fail (solution language)Rewritten as URS-058: the system shall prevent a user from approving a result the same user entered. The database-trigger detail moved to the design specification.

The point the specimen makes: URS-052 sails through because it is atomic, measurable, and stated as trigger plus result; URS-041 and URS-058 fail on specific, nameable defects, and the reviewer records the exact fix rather than a vague “improve.” That is what turns a review from a rubber stamp into a control.

Common inspection findings this checklist prevents

  • A URS full of untestable requirements (“user-friendly,” “as appropriate”), so acceptance was never truly defined.
  • Data integrity controls (audit trail, unique IDs, e-signature) assumed rather than written as requirements, so they were never specified or tested.
  • Compound requirements tested with a single script, leaving part of the requirement unverified but appearing covered.
  • A URS that reads like the vendor’s product description, with no evidence the regulated company defined its own needs.
  • Requirements with no IDs or with renumbering, so the traceability matrix cannot hold.

How to adapt this checklist

  1. Set the URS, system, and GAMP category in the header.
  2. Align the Part A data integrity row (A4) with your standard Part 11 / Annex 11 control list.
  3. For a low-risk configured product, you may run Part B only on the GxP-critical requirements and sample the rest; record that scoping decision.
  4. Keep QA and an SME as named reviewers; requirement quality is not a solo review.
  5. Confirm every regulation against the current published version before issue.