Independent and not affiliated with the FDA, MHRA, ISPE, PDA, or any agency. Get the appgoutham@madhadi.com
madhadi.comData Integrity & GxP Quality
Browse all topics → Articles Templates & Procedures Learning paths GlossaryScenariosToolsRegulatory ReferencesLearning PathsTopics About Start here
Form Plug-and-play starting point Supply Chain & GDP

Form: Transit Temperature Excursion Investigation and Disposition Record

A plug-and-play record for investigating and dispositioning a distribution temperature excursion, gating the quality decision on a trustworthy logger record and a stability-based rule, with field definitions and a filled specimen.

Document type: Form

Read and copy the template below into your own quality system. It is a generic starting point for your own internal use, provided as is, with no warranty; see the Terms and License. Adopting it does not by itself create compliance.

This is a ready-to-use record to document a single transit (or storage) temperature excursion from detection to disposition. It is the paired record for the excursion management SOP. Replace every <<FILL: ...>> placeholder. A field guide and a filled specimen follow.

Field guide

FieldFormatRequiredWho entersWhen
Record number<<FILL: scheme>>YesQAAt open
Product / lot / quantityText / numberYesLogisticsAt open
Shipment / order referenceTextYesLogisticsAt open
Logger serial / typeTextYesLogisticsAt open
Calibration reference and validityText / dateYesLogger ownerAt open
Detected by / dateText / dateYesDetectorAt open

Section 1: Event and quarantine

FieldEntry
Record number<<FILL>>
Product / lot / quantity<<FILL>>
Shipment / order reference<<FILL>>
Logger serial / type<<FILL>>
Detected by / date<<FILL>>
Quarantine applied (Y/N, system status)<<FILL>>
Sponsor QA notified (date / time)<<FILL>>
Raw logger data received (Y/N, location)<<FILL>>

Section 2: Trustworthiness gate (must pass before assessment)

CheckResult (Pass/Fail)Note
Calibration current and traceable<<FILL>><<FILL>>
Logger serial matches dispatch record<<FILL>><<FILL>>
Logging interval bounds the excursion duration<<FILL>><<FILL>>
No custody gap / data gap (profile brackets custody)<<FILL>><<FILL>>
Gate result<<FILL: PASS / FAIL>>If FAIL, default to reject/hold and raise a DI deviation

Section 3: Excursion characterization

FieldEntry
Limit(s) breached<<FILL>>
Peak temperature<<FILL>>
Segments above limit (count, durations)<<FILL>>
Cumulative time outside limit<<FILL>>
MKT (supporting only)<<FILL>>

Section 4: Acceptance-rule comparison

FieldEntry
Product stability-derived allowance<<FILL: peak / cumulative-time / freeze rule>>
Cumulative excursion budget already consumed by this lot<<FILL>>
Within allowance? (Y/N)<<FILL>>
If outside: stability / regulatory assessment reference<<FILL>>

Section 5: Disposition

FieldEntry
Disposition<<FILL: Release / Reject / Release-with-restriction>>
Rationale (tied to the rule, not to MKT alone)<<FILL>>
Inventory status updated (Y/N)<<FILL>>
Deviation / CAPA raised (number or N/A)<<FILL>>
QA disposition (name, signature, date)<<FILL>>

Acceptance criteria

  • Section 2 gate passed before any disposition, or the shipment was held / rejected and a DI deviation raised.
  • The disposition rationale references the stability-derived rule, not MKT alone.
  • Raw logger data, calibration certificate, and this record are retained together.

References

EU GDP (2013/C 343/01), Chapter 9 (Transportation). USP General Chapter <1118> (Monitoring Devices). MHRA GxP Data Integrity Guidance; PIC/S PI 041.

Confirm current versions before issue.


Filled specimen

Illustrative completed record for an example 2-8 C biologic shipment.

SectionEntry
Record numberEXC-2026-0231
Product / lot / quantitymAb-217, lot L26-118, 50 units
Logger serial / typeTL-2291847, single-use electronic
Trustworthiness gateCalibration valid to Dec 2026, NIST-traceable; serial matched dispatch; 10-min interval; profile 06:00-23:32 brackets custody. Gate: PASS
CharacterizationAbove 8 C: 2 segments (20 + 50 min), cumulative 70 min; peak 9.4 C; MKT 5.9 C
Acceptance-rule comparisonAllowance: up to 96 h cumulative 8-25 C; 70 min within budget; no prior excursions on lot. Within allowance: Yes
DispositionRelease; rationale: within studied allowance, gate passed, budget recorded; QA R. Gomez, 12 Jun 2026

The record shows the gate first, the rule second, and MKT used only as support. That ordering is what makes the release defensible to an inspector.

Common inspection findings this record prevents

  • A disposition with no record of whether the temperature data could even be trusted.
  • A release justified by MKT while a peak or cumulative-time limit was breached.
  • Raw logger data not retained with the disposition.

How to adapt this form

  1. Pre-load the product allowances or reference the stability document that holds them.
  2. Add a field for the cumulative-budget ledger if you track allowance consumption across a lot’s life.
  3. Point the deviation / CAPA field to your real procedures.
Use madhadi.com as an app Full screen, works offline, one tap from your home screen.