Independent and not affiliated with the FDA, MHRA, ISPE, PDA, or any agency. Get the appgoutham@madhadi.com
madhadi.comData Integrity & GxP Quality
Browse all topics → Articles Templates & Procedures Learning paths GlossaryScenariosToolsRegulatory ReferencesLearning PathsTopics About Start here
Form Plug-and-play starting point Quality Assurance

Form: Supplier Quality Questionnaire

A plug-and-play supplier quality self-assessment questionnaire with scored sections, acceptable-answer and red-flag guidance, a reviewer disposition block, and a filled specimen, for qualifying GxP material, service, and software suppliers.

Document type: Form

Read and copy the template below into your own quality system. It is a generic starting point for your own internal use, provided as is, with no warranty; see the Terms and License. Adopting it does not by itself create compliance.

This is a ready-to-use form. Send sections A through K to the supplier to complete, then a named reviewer at <<FILL: COMPANY NAME>> scores each section and records the disposition. The form is not finished when it comes back filled in; someone has to read it, score it, and follow up. A worked filled specimen follows the template. Verify each cited regulation against the current source before you rely on it.

Document control header

FieldEntry
Form titleSupplier Quality Questionnaire
Form number<<FILL: FRM-ID, e.g. FRM-QA-022-01>>
Version<<FILL: version, e.g. 1.0>>
Effective date<<FILL: effective date>>
Linked SOP<<FILL: SOP-ID for supplier qualification>>
RetentionPer records retention schedule, not less than <<FILL: retention period>>

How to use this form

  1. Procurement or QA issues the questionnaire tailored to the material, service, or software being sourced. Sections marked optional may be removed when they do not apply.
  2. The supplier completes every applicable question and attaches the requested evidence.
  3. A named reviewer scores each section: Green (acceptable), Yellow (acceptable with open items), Red (not acceptable, requires resolution before approval).
  4. The reviewer records open items and a section-level disposition, then completes the overall conclusion.
  5. The completed, scored form becomes part of the supplier qualification record and feeds the approval decision.

Section 0: Supplier identification (completed by supplier)

FieldEntry
Legal company name<<FILL>>
Manufacturing / service site address<<FILL>>
Other sites involved in this scope<<FILL>>
Quality contact (name, title, email)<<FILL>>
Material(s) or service(s) offered to us<<FILL>>
Years in operation / under current ownership<<FILL>>
Number of employees / quality staff<<FILL>>
Date completed and completed by<<FILL>>

Section A: Quality management system

#QuestionAcceptable answerRed flag
A1Is your QMS certified or registered? By whom, to which standard, and what is the certified scope?Current ISO 9001, ISO 13485, or GMP certificate; scope covers the material or service offered”In progress”, expired certificate, or scope mismatch
A2Attach the current certificate(s) and the quality manual table of contents.ProvidedNot provided or refused
A3How often is the QMS reviewed by management, and who owns it?Defined management review cycle, named ownerNo defined review, no named owner
A4Do you operate to a recognized GMP, GLP, or GCP standard for the offered scope? Which one?Names the correct standard for the activityCannot name a standard, or names an irrelevant one

Reviewer score (A): <<FILL: Green / Yellow / Red>> - open items: <<FILL>>

Section B: Regulatory and inspection history

#QuestionAcceptable answerRed flag
B1Have you been inspected by a regulatory authority in the last 3 years? List authority, date, and classification or outcome.Disclosed with dates and outcomesRefuses to disclose, or recent critical findings
B2Have you received a warning letter, import alert, or equivalent in the last 5 years?Disclosed; remediation described and verifiableUndisclosed, or open enforcement on this scope
B3Have you had a product recall related to quality in the last 3 years?Disclosed with root cause and corrective actionUndisclosed recall history
B4Do you hold the licenses or registrations required to supply this material or service in our market?Yes, current, attachedMissing or expired

Reviewer score (B): <<FILL>> - open items: <<FILL>>

Section C: Change control

#QuestionAcceptable answerRed flag
C1Do you operate a formal change control process? Attach the procedure summary.Yes, documented and appliedNo formal process
C2Will you notify us of changes to process, formulation, site, equipment, test method, or key raw material before they take effect?Yes, with a defined notification window”Case by case” or no commitment
C3Which changes do you agree require our prior approval, not just notification?Changes to registered details and process-critical attributesNone, or only at supplier discretion
C4How do you control changes to subcontracted or onward-supplied activities?Flow-down controls describedNo control over subcontractors

Reviewer score (C): <<FILL>> - open items: <<FILL>>

Section D: Deviations, CAPA, and complaints

#QuestionAcceptable answerRed flag
D1Do you operate documented deviation and CAPA processes?Yes, both documentedOne or both absent
D2How do you handle a customer complaint, and within what timeframe do you acknowledge and respond?Defined process and response timesNo defined process or timing
D3How do you investigate root cause, and how do you verify CAPA effectiveness?Structured RCA and an effectiveness check”We fix the immediate problem” only
D4Provide an example (anonymized) of a recent investigation and its CAPA.A real, traceable exampleCannot provide one

Reviewer score (D): <<FILL>> - open items: <<FILL>>

Section E: Materials, manufacturing, and process control (material suppliers)

#QuestionAcceptable answerRed flag
E1How are starting materials and components evaluated and approved?Documented incoming control and approvalAccepted on supplier word alone
E2What in-process controls and release testing apply to the offered material?Defined controls and specificationNo defined controls
E3How do you control cross-contamination and, where relevant, microbial and endotoxin limits?Controls appropriate to the materialNot addressed for a material that needs it
E4What stability or retest data supports the assigned expiry or retest period?Stability program describedExpiry assigned with no data
E5What is the certificate of analysis format, and which results does it report against specification?CoA reports actual results vs. specCoA states “complies” with no values

Reviewer score (E): <<FILL>> - open items: <<FILL>>. Mark N/A for service or software suppliers.

Section F: Data integrity

#QuestionAcceptable answerRed flag
F1Are laboratory and production systems that generate GxP data audit-trailed, with unique user logins and role-based access?Yes, with examplesShared logins, audit trail off or unverified
F2Can ordinary users disable the audit trail, change the system clock, or delete raw data?No; controls and segregation in placeYes, or cannot say
F3How is raw data and metadata retained, backed up, and protected from loss?Defined retention and backupNo defined retention
F4Do your records and systems satisfy the ALCOA+ data quality principles, meaning each record can be traced to its author, stays readable, is captured at the time of the activity, preserves the first capture and its metadata, reflects what actually happened, leaves nothing out, agrees across the record set, survives for its full retention life, and can be retrieved when needed?Yes, demonstrableCannot demonstrate

Reviewer score (F): <<FILL>> - open items: <<FILL>>

Section G: Software development and security (software and SaaS suppliers)

#QuestionAcceptable answerRed flag
G1Do you operate a formal, documented software development lifecycle?Yes, documentedNo SDLC
G2How are defects identified, tracked, and resolved, and can we see the defect history relevant to our release?Tracked; history availableNo defect tracking, or not shareable
G3How are releases tested and documented before they ship, and how are updates communicated to us?Documented test and release notes with noticeShips updates without notice or evidence
G4How are security vulnerabilities found and patched, and on what timeline?Defined process and timelineNo defined process
G5For hosted services: where is data physically stored and under which jurisdiction, and what audit access do we hold?Disclosed; audit rights grantedUndisclosed location; no audit rights
G6Provide your validation support documentation and any third-party report (for example SOC 2 Type II).ProvidedNot available

Reviewer score (G): <<FILL>> - open items: <<FILL>>. Mark N/A for material suppliers. A SOC 2 report supports but does not by itself prove 21 CFR Part 11 or EU Annex 11 compliance.

Section H: Subcontracting and supply chain

#QuestionAcceptable answerRed flag
H1Do you outsource any part of the contracted activity? List the activities and the subcontractors.Disclosed with names and oversightUndisclosed onward subcontracting
H2How do you qualify and monitor your own suppliers and subcontractors?Documented supplier programNo supplier control
H3Can you maintain traceability of the supply chain for the offered material or service?Yes, end to endGaps in traceability

Reviewer score (H): <<FILL>> - open items: <<FILL>>

Section I: Training and personnel

#QuestionAcceptable answerRed flag
I1How are staff trained and qualified for the activities they perform, and are training records retained?Documented training and recordsNo training records
I2Are analysts qualified against the specific methods they run?Yes, method-specific qualificationGeneral training only

Reviewer score (I): <<FILL>> - open items: <<FILL>>

Section J: Audit and access

#QuestionAcceptable answerRed flag
J1Will you grant us the right to audit on a schedule and for cause?Yes, in the quality agreementRefuses or limits unreasonably
J2When was your most recent customer or third-party audit, and will you share the summary?Recent, summary shareableNo recent audit, or refuses to share

Reviewer score (J): <<FILL>> - open items: <<FILL>>

Section K: Supplier declaration

StatementEntry
The information provided is accurate and complete to the best of my knowledge.Yes / No
We will notify <<FILL: COMPANY NAME>> of changes affecting the offered scope before they take effect.Yes / No
Authorized signatory (name, title)<<FILL>>
Signature and date<<FILL>>

Reviewer disposition (completed by <<FILL: COMPANY NAME>>)

FieldEntry
Reviewer (name, role)<<FILL>>
Date reviewed<<FILL>>
Section scores (A to K)<<FILL: e.g. A G, B G, C Y, ...>>
Open items requiring resolution before approval<<FILL>>
Overall conclusionAcceptable / Acceptable with conditions / Not acceptable
Recommended next step<<FILL: proceed to documentation review / audit / reject>>
Reviewer signature and date<<FILL>>

Acceptance criteria

The questionnaire is acceptable for use in a qualification decision when:

  • Every applicable section is completed by the supplier and signed in the declaration (Section K).
  • A named reviewer has scored every applicable section Green, Yellow, or Red, not left any blank.
  • Every Red and every Yellow has a recorded open item and a defined resolution path.
  • The overall conclusion and recommended next step are signed and dated.
  • The requested evidence (certificates, procedure summaries, example records) is attached, not just promised.

References

21 CFR 211.84 (testing and approval of components) and 211.68 (computerized systems). 21 CFR 820.50 and ISO 13485:2016 clause 7.4 (purchasing controls, devices). EudraLex Volume 4, Chapter 5 and Chapter 7. ICH Q10 and ICH Q9. MHRA GxP Data Integrity Guidance and PIC/S PI 041 (for Section F). 21 CFR Part 11 and EU GMP Annex 11 (for Sections F and G).

Confirm the current version and clause numbers of each reference before issue.


Filled specimen

The following shows Sections A, C, and F completed and scored for an example contract testing laboratory, so you can see the level of detail a reviewer is expected to produce. The supplier, dates, and findings are illustrative.

Supplier: Meridian Analytical Services, Site 2 (Lyon, FR). Material or service: dissolution and assay testing, USP methods.

SectionSupplier answer (summary)Reviewer scoreOpen item
A1 to A4ISO 17025 accredited, scope covers dissolution and assay; GMP self-declared, last regulatory inspection 2024 (no critical findings); QMS reviewed annually, owned by Quality Director.GreenNone
C1 to C4Formal change control; agrees to notify method or instrument changes 30 days ahead; agrees prior approval for changes to validated methods used on our products; subcontracts nothing.YellowNotification window of 30 days acceptable, but supplier wanted “where practical” on prior approval. Reviewer to require firm prior-approval commitment in the quality agreement.
F1 to F4CDS audit-trailed, unique logins, role-based access; analysts cannot disable audit trail; admin rights held by IT only; raw data retained 10 years with nightly backup. F2: confirmed analysts have no reprocessing rights without QA sign-off.GreenNone, but verify CDS reprocessing controls on the on-site audit.

Reviewer (M. Devlin, QA), 2026-05-18. Overall conclusion: Acceptable with conditions. Recommended next step: proceed to on-site audit; carry the change-control prior-approval wording and the CDS reprocessing check into the audit plan and the quality agreement.

In this example the reviewer did not stop at “the form looks fine.” A vague answer on prior approval became a Yellow with a concrete action that flows into the quality agreement, and a strong data integrity section still generated a verification point for the audit. That is what turns a returned form into a decision input.

Common inspection findings this form prevents

  • Questionnaires collected and stored with no reviewer signature, no score, and no follow-up on worrying answers.
  • A generic form every supplier completes the same way, producing a file rather than information about the specific material.
  • A “complies” certificate of analysis accepted without confirming it reports actual results against specification.
  • Shared logins or a disable-able audit trail at a supplier that generates data used in your release decisions, never surfaced before approval.
  • A software vendor approved on a SOC 2 report alone, with the Part 11 and Annex 11 specific controls never checked.
  • Undisclosed onward subcontracting discovered only after a batch behaved differently.

How to adapt this form

  1. Set your form number, linked SOP, and retention period in the header.
  2. Remove Section E for service and software suppliers; remove Section G for material suppliers; keep Section F for everyone who creates GxP data.
  3. Add material-specific questions where they earn their place (for example aseptic and environmental monitoring detail for a sterile component, lot-to-lot consistency for a chromatography reagent).
  4. Tie the scoring scheme (Green, Yellow, Red) to the dispositions your supplier qualification SOP recognizes, so a Red means the same thing every time.
  5. Confirm every regulation in the references against the current published version before issue.
Use madhadi.com as an app Full screen, works offline, one tap from your home screen.